Skip to main content
Skip to content

article

Data centers are back in strategy

Compute placement has returned to the executive agenda because AI economics, data gravity and power availability now shape product choices.

Emil Shirokikh · Published September 6, 2026 · Updated September 23, 2026 · 2 min read

Infrastructure, reliability and security engineering environment

Abstract

The cloud did not make physical infrastructure irrelevant. It abstracted it until workload scale and accelerator scarcity made location, cooling and network design visible again.

Place workloads deliberately

AI accelerators, power availability, data gravity and egress have made physical placement visible again. The answer is rarely one location for every workload.

Cost model

Segment training, inference, storage and regulated workloads. Model utilization, energy, egress, latency, capacity commitments and migration cost for each.

Decision record

Approve a mixed-placement map with assumptions that finance and engineering can revisit.

Challenge the conclusion

Most organisations should not build a facility. They should understand the infrastructure economics beneath their contracts.

Use this in a working session

Stress the model at low utilization and high growth, then identify which commitment becomes irreversible first.

BELTO editorial analysis. It does not describe a client engagement or claim a commercial result.

Author

Emil Shirokikh

Founder

Founder of Belto Inc. Writes on engineering, venture building and applied intelligence.